Multi-Family Office · Digital Infrastructure

Powered land to live load in eight months.

Ferrock AI builds complete data centers on land it controls. Substation to white space, everything but the GPUs, on permanent family capital.

0.0GWControlled Pipeline
0+ ACLand Under Control
0MORecord Delivery
$0.0BCommitted Capital
Operated by a multi-family office · Backed by and alongside
PAGAsia-Pacific Alternatives · $55B+ AUM MercuriaGlobal Energy & Commodities · Founding Capital BrightrayPrefab Delivery Partner Anchor Families ×6Evergreen Commitments Ferrock HoldingsMulti-Family Office Platform
Sheet 02 — Vertical IntegrationDirt → Racks, One Owner

Who you're dealing with

The buyer, not a broker.

Land deals die on middlemen: option flippers, financing outs, developers who need three other parties to say yes. Ferrock is the end owner. The name on your contract is the name on the money, the factory, and the lease.

Layer 01

Land & Power

Site control, entitlement, water, interconnection. Carried on our balance sheet from LOI to energization.

4,500+ AC · 2.6 GW
Layer 02

Turnkey Delivery

Brightray-built halls, 90% factory-complete, commissioned in parallel with sitework. Everything but the GPUs.

48 MW BLOCKS · 8 MO
Layer 03

Permanent Capital

Evergreen family commitments. We underwrite decades, not exit windows.

$4.2B COMMITTED
Layer 04

Tenancy

We don't build on spec. Blocks are shaped to signed load letters from a standing tenant network.

40+ COUNTERPARTIES

Holding powered land?

Sell to us, or build with us.

Sell outright at powered-land value, or put your acres into the campus and hold alongside us. We answer inside a week.

  • LO-1Family balance sheet. No financing contingency. Nine-day record close.
  • LO-2Tenant-secured before steel. Your ground becomes a campus, not a land-bank position.
  • LO-3Structures that keep you in. Hold upside in the finished campus.
  • LO-4One conversation, principal to principal, in confidence.
Get in Touch
Ferrock AI campus energized at golden hour 48 MW Energized — Month 8

The record — FRK-TX1

0MONTHS

Dirt in January. Live load by September.

Our first campus energized 48 MW eight months after groundbreak, on ground we already held and power we already carried. The next blocks are on the same schedule.

We don't publish the rest of the campus's numbers; the register is shared under NDA.

How Eight Months Happens
Sheet 03 — Footprint7 Campuses · 3 Grids + APAC

Footprint

Where we build.

ERCOT and PJM anchor the US position. With PAG, the platform is extending into Johor and Kansai.

FIG. 03-A — US CAMPUSES · EQUIRECT. PROJ.
Energized / BuildingPowered Land
Sheet 04 — ScheduleThe Eight-Month Standard

Speed, engineered

The schedule, compared.

Δ 22 MONTHS RECLAIMED

A conventional build waits for land, then permits, then power, then steel. We start from powered land and factory-built halls, so the critical path runs through a production line.

Inside the Eight-Month Standard
Ferrock AI × Brightray — groundbreak to energization8 MO
Fab ∥ SiteworkSet + Fit-outEnergize
Conventional stick-built delivery30 MO
DesignPermitsShellMEPFit-outCommission
MO 0MO 6MO 12MO 18MO 24MO 30
0%Factory-PrefabricatedWelded steel buildings, tested before they ship.
1.15PUEDesign EfficiencyClosed-loop thermal plant, engineered for sustained AI load.
0kWPer-Rack DensityDirect-to-chip cooling from day one.
0GALPotable Water for CoolingZero evaporative draw on local aquifers.